Syntax
|
Example
|
Purpose
|
LID SD-WAN Site Survey
|
AB12 SD-WAN Site Survey
|
To be used for engagement when a site survey is required.
|
LID SD-WAN Hardware Install
|
AB12 SD-WAN Hardware Install
|
To be used for any hardware scope must be installed out-side a cutover window; including but not limited to: router installation, modem installation, LTE module installation, etc.
|
LID SD-WAN Cabling Install
|
AB12 SD-WAN Cabling Install
|
To be used for any cabling scope related to SD-WAN (such as a DMARC extension).
|
LID SD-WAN Cutover
|
AB12 SD-WAN Cutover
|
To be used for SD-WAN migration / turn-up activities when on-site support is required. This would include any previous activities if they're scheduled to take place in the same change window.
|
LID SD-WAN On Site Support
|
AB12 SD-WAN On Site Support
|
To be used for other miscellaneous scope that is required out-side a cutover window; including both pre-migration activities and post-migration activities.
|